Within the scope of Voyage Sorgun Hotel Sand Holder Breakwater Construction and Coastal Arrangement project, the works of covering the rocks on the 160 meter long beach by laying jutbag sets covered in sand and expanding the usage area of the beach have been completed. The rocks within the walking distance of the coast were covered with sand pumped by the pontoon and pump equipment settled at the sea and the beach area was expanded.