740m² deck lining guard along with the stairs and the disabled lift were delivered for the pier to be constructed within the scope of Vertia Luxury Resort Hotel Pier Project. 94 piles, iron installations inside the piles, C SDC concreting, epoxy lining-dye protection at weld points, LED lighting and in-water lighting systems were used in this project.