After cleaning with industrial diving team of the parts on and under the water of 320 steel piles under Awaza Villa, about 200m long on the sea surface beginning from the coastline, in Türkmenbaşı area, Turkmenistan, the isolation material "MarineProtect Primer" and MarineProtect Tape" were applied respectively for insulation. After completion of insulation of the steel piles, "MarineProtect Jacket" was applied. After insulation with clamps and jacketing of the piles, the project was delivered.